Portek OneStop
  • Experience Gallery
  • Technical Articles
  • Forum
  • Contact Us
  • Click to open the search input field Click to open the search input field Search
  • Menu Menu
  • Link to LinkedIn

20 RTGs height raise – Indonesia

Portek performed 20 RTG height raise from 1 over 4 to 1 over 5 height, in Indonesia, in 2014.

This project also include 10 RTG refurbishment with the following scopes;

  • gearbox overhaul, hoist drum pedestal bearing replacement
  • trolley wheel replacement
  • replacement of seat and console in operator cabin, etc

Before installing leg section – Indonesia

New leg sections – Indonesia

During leg section installation – Indonesia

Installing leg section – Indonesia

After height raise – Indonesia

Gantry boogie pin boring – Indonesia

Gantry boogie repair – Indonesia

Gantry repair – Indonesia

Hoist gearbox overhaul – Indonesia

Hoist pedestal – Indonesia

Hoist system refurbishment – Indonesia

Back to Experience Gallery

Headquartered in Singapore, Portek has offices in over 8 countries throughout Asia, Europe and Africa, with staff strength of about 1400 employees.

Portek is a subsidiary of Mitsui & Co., Ltd. of Japan, which is a veritable household name within the industry. Leveraging on Mitsui’s established global network, Portek is able to deliver enhanced knowledge and solutions in port business, as we combine Portek’s niche capabilities and “can-do” spirit with Mitsui’s resources.

Link to: Mobilisation & Modification -STS from Taiwan to Alaska Link to: Mobilisation & Modification -STS from Taiwan to Alaska Mobilisation & Modification -STS from Taiwan to AlaskaSea lashing Mobilisation STS Link to: Modernisation – 8xRTG in Sri Lanka Link to: Modernisation – 8xRTG in Sri Lanka RTG retrofit Sri LankaModernisation – 8xRTG in Sri Lanka
Scroll to top Scroll to top Scroll to top